Building Permits should be obtained from the Building Official and are required prior to beginning any of the following activities:
Alteration
Construction
Conversion or demolition of a building or structure
Reconstruction
Repair
This includes the installation or altering of any equipment regulated by the USBC.
When there is a change of occupancy of an existing structure and a new certificate is required by the USBC, removing or disturbing any asbestos containing materials, or movement of a lot line that can affect the safety of an existing structure.
Contact
Building Official's Office 6489 Main Street Gloucester, VA 23061 Phone: 804-693-2744